Payload reservations open
Payload flights
to the Moon.
Reserve space for an instrument or cargo on a shared commercial lander. We’re planning the first flight for 2029.
View flight detailsView coordinates and illumination. 4.1° S / 7.2° W
Lunar atlas
Lighting on 20 Nov 2026 at 12:00 UTC
- View center latitude
- 4.1° S
- View center longitude
- 7.2° W
- Sun elevation
- 35.3°
- Distance to lunar center
- 380,871 km
- Target landing year
- 2029
- Shared payload block
- 10 kg
- Capacity per slot
- 2 kg
- Lander selection
- Pending
Lunar programs
Payload flights
Share a lander with other teams and reserve only the slots your payload needs.
Shared prospecting
Propose an instrument or share in a survey of lunar ice and minerals.
Moon base
See the plan for shared power, communications and, eventually, a crewed outpost.
Lunar Virtual Twin
Inspect a model of sunlight, Earth visibility and power at a candidate landing site.
Colorado plant In planning
Defense hardware,
built in Colorado.
Our planned plant builds mobile ground stations, vehicle communications fits, equipment rooms and print cells, and runs integration, fabrication and test for other hardware teams. Requests are free and non-binding while the plant is in development.
See defense systemsDefense systems
Counter-drone vehicle integration
Counter-drone sensors, effectors and command displays installed on the vehicles you field.
Mobile ground station
Satellite terminals, power and an operator rack on a trailer or vehicle, built to set up at a site and connect to your network.
Vehicle communications fit
Satellite terminals, radios and power installed in tactical or commercial vehicles at a drive-in bay.
Portable equipment room
A shipping container or shelter fitted with racks, power, cooling and cable entry, so electronics deploy as one unit.
Containerized print cell
A metal 3D printing cell in a shipping container, with power, ventilation and powder handling, to make parts close to where they are needed.
Plant lines
Integration
Radios, satellite terminals, power and racks fitted to your vehicle, shelter or container.
Build to print
Machined parts, harnesses and assemblies made and inspected to your drawing.
Interceptor and missile components
Structures, cable harnesses and electronics assemblies built to prime contractor drawings. The plant handles no energetics.
Test
Thermal, vacuum and vibration testing, from an individual run to a staffed campaign.
High bay
Crane-served assembly space for spacecraft structures and large hardware.
Ground segment
Proposed antenna hosting and contact time for satellite operators and lunar missions.
Bays and suites
Work bays and dedicated suites for teams that bring their own equipment and people.
Mission timeline
These are planning dates. Each stage depends on funding and completion of the work before it.
- 2027Form the base partner group and introduce a payload price index.
- 2028Build and test the payloads selected for the first flight.
- 2029Land the first shared payload block on the Moon.
- 2031 to 2033Install a shared power and data node at the surface.
- Mid-2030sEstablish a crewed outpost, then open a small number of visits.
Mission record22 Nov 2026
Free reservations opened for the planned first flight. Lander selection is pending. Constanellis has yet to fly a payload.
The team completed version 2.0 of the Lunar Virtual Twin and published its capability statement for government program offices.
Lunar imagery and elevation data courtesy of NASA’s Scientific Visualization Studio, Goddard Space Flight Center and Arizona State University. Lunar illumination, 20 November 2026 at 12:00 UTC.




